New Build Snagging
A snagging inspection checks a new build home for defects and unfinished work, so the builder fixes them under warranty. We go room by room through finishes, doors, windows, levels and services, and add a thermal scan for missing insulation and air leaks that a normal snag list can't see.
When should I get a snagging inspection?
Ideally before you complete, so the builder fixes snags before you move in. If you've already moved in, do it as soon as you can: builders are usually responsible for defects during the first two years of the warranty.
What does thermal imaging add to snagging?
Gaps in insulation, cold bridges and air leaks round windows and loft hatches are invisible to the eye in a brand-new house. The thermal camera shows them, with images the builder can't argue with.
What we look for
What We Check For
Kit: Thermal camera, moisture meter, laser level.
- Missing or patchy insulation
- Air leaks round windows, doors and hatches
- Floors and walls out of level
- Doors and windows that stick or don't seal
- Damp from plaster still drying out
- Finishing defects room by room
Questions
New Build Snagging Questions
Will the builder accept an independent snag list?
Builders deal with snag lists all the time. Clear photos, thermal images and level readings with locations make the list easy for them to act on and hard to dismiss.
How long does it take?
Around two to four hours for a typical three-bed house.
Do I need the builder's permission before completion?
Usually you need the developer to agree access before you complete. Ask your sales contact to arrange it.
What's a typical snag?
Paint and sealant finishes, doors that catch, gaps in skirting and trims, and out-of-level floors are common. Thermal imaging adds insulation gaps and draughts most snag lists miss.
Same visit
Add These To Your Check
Book
See Where Your Heat Goes
Tell us where you are and what you'd like checked, and we'll come back with a slot. Or call 07367 764156.